Power (DISCOM)
HESCOM
Licence
Not required (de-licensed)
Karnataka road tax
Rolled back in 2026 → 5–10% by price band
Corridor position
NH-48, first major Karnataka city south of the Maharashtra border
Public EV charging tariff
₹4.50/unit energy · ₹70/kW/month LT fixed charge (KERC, 27 March 2025)
Planning to set up an EV charging station?
Tell us your location and plans — our team will get in touch to help you take the next step, from site and cost to subsidies and partners.
Chat on WhatsAppCoverage has not kept pace with that adoption. Belagavi does have named operators — a ChargeZone × TATA.ev MegaCharger at Nehru Nagar, Tata Power points at Gogte Plaza and at Kakti, and Ather Grid coverage for two-wheelers — but for a city registering more than 600 EVs a month, the public network is thin, and it is concentrated in a few pockets rather than spread across the city.
Why Belagavi, and what the EV numbers actually say
655 pure EV registrations out of 3,640 new vehicles in June 2026 — roughly 18%, with 628 of 3,532 the month before. Almost all are two-wheelers: Ather 105, River Mobility 42, Ola 28, Greaves 24, Simple Energy 23, with Tata passenger EVs at 14.
That adoption rate is genuinely high for a non-metro Indian city, and it tells you something specific about what to build. An 18% EV share made up overwhelmingly of two-wheelers means a large and growing base of riders who charge at home and occasionally need a public top-up — an AC-charging market, priced low, with high utilisation and low margin per session. The 14 electric cars a month are a different and much smaller local market.
The paying customer for DC fast charging in Belagavi is therefore mostly passing through. Belagavi sits on NH-48 with the Hirebagewadi toll plaza at chainage km 482.600, which was recording around 27,249 PCU per day when last published in 2016. The Kognoli plaza near the Maharashtra border is at km 591.240. A driver heading north into Maharashtra or south towards Hubballi and Bengaluru will stop here, and that is where fast-charging revenue comes from.
The city's own economy is unusually electricity-intensive, which helps on the supply side: Belagavi's industrial power consumption of 526.62 MU exceeds its domestic consumption of 406.38 MU. Where industrial load already dominates, HT capacity and the engineering to connect to it exist locally.
Existing charging is concentrated around Nehru Nagar, Gogte Plaza and Kakti, with Ather Grid points serving two-wheelers. That leaves whole quadrants of a fast-growing city — and most of the NH-48 approaches — without convenient public charging.
Where to put a charger in Belagavi
The industrial belt is the obvious first look. Belagavi has estates at Udyambag, Machhe, Honaga, Kanagla, Kittur, Kakati and Auto Nagar, anchored by foundry, aerospace and automotive component manufacturing — Aequs Aerospace, Hindalco, Dalmia Cement and Ashok Iron among the larger names, with around 45 large-scale industries in the district. The land bank is tight at roughly 100 acres, with about 4,000 acres identified for acquisition, so industrial frontage is not abundant.
The airport is worth a look. Belagavi handled a little over 3 lakh passengers in FY2025-26, and although traffic fell year on year while Hubballi's grew, a new 20,000 square metre terminal costing around ₹230 crore is due by the end of 2026. Airport charging serves taxi fleets and long-stay parking, both good utilisation profiles. Note that Belagavi is a dual-use civil and Indian Air Force station, which constrains land use near the airfield.
There is one demand pattern here that exists nowhere else in Karnataka: the state legislature holds its winter session at the Suvarna Vidhana Soudha in Belagavi. That produces a concentrated December spike in official vehicles, visitors and hotel occupancy. It is seasonal rather than a business on its own, but it is worth knowing if you are choosing between two otherwise similar sites.
On public transport, 100 of the 200 electric buses sanctioned to NWKRTC under PM E-Drive are earmarked for Belagavi, with a five-acre depot planned; the Hubballi and Belagavi depots together are costed at roughly ₹31 crore across civil and electrical works. As elsewhere, depot charging is closed to outside operators, but the electrical groundwork and the visible fleet both help the wider market.
- NH-48 frontage near Hirebagewadi — through-traffic between Maharashtra and Hubballi
- Udyambag, Machhe and Honaga industrial estates — foundry and aerospace, heavy existing load
- Belagavi airport — taxi fleets and long-stay parking, with a new terminal due end-2026
- Hotels and commercial areas serving the December legislature session
- AC charging in dense residential areas — matches the two-wheeler-heavy adoption pattern
HESCOM connection and the Karnataka EV tariff
Karnataka does not waive demand charges. KERC expressly refused the DISCOMs' request to move EV charging to a single-part tariff, so you pay ₹70 per kW per month on LT or ₹200 per kVA per month on HT, whether or not anyone charges. Model this before you size your connection.
Belagavi is served by HESCOM, whose corporate headquarters are in Hubballi. One thing that surprises applicants: even though HESCOM is your distribution company, BESCOM is the designated State Nodal Agency for setting up EV charging stations across the whole of Karnataka. BESCOM also runs a Land Aggregator Portal that matches landowners with charge point operators, which is a legitimate route if you have land but not the appetite to operate.
The tariff is set by the KERC Combined Tariff Order 2025, dated 27 March 2025, covering the control period FY2025-26 to FY2027-28. Schedule LT-6(c) and its HT equivalent price EV charging stations at 450 paise per kWh — ₹4.50 a unit — with an LT fixed charge of ₹70 per kW per month of sanctioned load, or an HT demand charge of ₹200 per kVA per month of billing demand. The rates were set identically across all three years of the control period. KERC did reopen the 2025 order in March 2026 to revise several other categories, but LT-6(c) was not among them — worth re-checking before you model a long horizon.
The energy rate looks excellent next to Maharashtra's ₹9.25. The catch is the fixed charge. BESCOM, MESCOM and HESCOM all asked KERC to adopt a single-part tariff following the Ministry of Power's 2024 guidelines, and the Commission refused, reasoning that its two-part tariff already recovers only 51% of the average cost of supply and therefore delivers a larger concession than the guidelines contemplate. So a 60 kW DC charger carries roughly ₹4,200 a month in fixed charges before a single unit is sold.
Two further points that are widely misreported. Karnataka has no solar-hour discount or non-solar surcharge for public EV charging — the rate is flat all day, so the Ministry of Power's 0.7× and 1.3× model does not apply here. And the time-of-day table that appears in the LT-6(c) schedule applies only to bus depot charging for BMTC, KSRTC, NEKRTC and NWKRTC on HT supply, not to commercial public charging.
| Component | LT-6(c) | HT |
|---|---|---|
| Energy charge | ₹4.50/unit | ₹4.50/unit |
| Fixed / demand charge | ₹70 per kW/month | ₹200 per kVA/month |
| Solar-hour concession | None | None |
| Time-of-day variation | None for commercial public charging | Depot charging only |
Karnataka public EV charging tariff, FY2026-27 (flat across the control period)
Karnataka subsidy and the road-tax change you must not get wrong
Karnataka withdrew its EV road-tax exemption in April 2026. Electric cars now pay 5% of cost up to ₹10 lakh, 8% between ₹10 and ₹25 lakh, and 10% above ₹25 lakh. The Clean Mobility Policy PDF still carries the old exemption wording — anyone quoting it verbatim in 2026 is publishing a position that no longer exists.
The operative policy is the Karnataka Clean Mobility Policy 2025-30, notified by Government Order CI 117 SPI 2024(e) on 11 February 2025 and gazetted the following day. It supersedes the 2017 EV and Energy Storage Policy and runs five years or until a new policy is announced.
For charging it is refreshingly specific. Clause 4.3.2.1 offers a capital subsidy of 25%, up to ₹10 lakh per station, for fast charging stations serving two-wheelers, three-wheelers, cars and buses, across 500 stations, and it applies to all zones at the same rate — the 25%/20% split people quote is the general manufacturing capex subsidy, not this. Clause 4.3.2.2 is blunt about slow charging: no incentives. Battery swapping gets 25% up to ₹3 lakh for two- and three-wheeler stations across 500 sites, and 25% up to ₹10 lakh for bus swapping across 200.
Two honest caveats. There is no viability gap funding in this policy — the word does not appear in the gazette, so any page claiming Karnataka VGF for charging is wrong. And while the policy is legally in force, no separate operational guidelines, scheme document or application window for the charging subsidy could be found as of August 2026. Treat it as gazetted but not demonstrably operationalised, and do not build a business case that depends on the money arriving.
The road-tax change is the item most likely to catch you out. The Karnataka Motor Vehicles Taxation (Amendment) Act 2026 was passed on 26 March 2026, received assent on 9 April and was notified on 10 April. Electric cars, jeeps, omni buses, private service vehicles and motor cabs now attract lifetime tax of 5% of cost up to ₹10 lakh, 8% from ₹10 to ₹25 lakh, and 10% above ₹25 lakh. Previously everything below ₹25 lakh was exempt. Electric two- and three-wheelers appear to remain exempt, as the amendment inserts no new part for them. This does not affect your charging station directly, but it affects your customers' purchase economics and therefore your demand curve.
Cost, returns and next steps in Belagavi
Setup cost runs roughly ₹5–12 lakh for a small AC station and ₹12–30 lakh for a mid-size DC station before any subsidy — the final figure turns on your HESCOM sanctioned load, land or rent, and civil work. Model your own numbers with the EV charging station ROI calculator, see the full setup cost breakdown, and read whether the business is actually profitable. The national rules — licensing, approved equipment and Ministry of Power guidelines — are in our full guide to starting a charging station business, and the Karnataka incentive position is set out in the Karnataka EV subsidy guide. If you would rather partner than build alone, compare franchise and dealership options.
Belagavi EV charging station — FAQs
How do I start an EV charging station in Belagavi?+
Choose a site — NH-48 frontage, an industrial estate at Udyambag or Machhe, or the airport are the strongest options — then apply to HESCOM for a commercial connection under the LT-6(c) or HT EV charging category, install approved chargers and follow the Ministry of Power guidelines. No electricity licence is required. Note that although HESCOM is your distribution company, BESCOM is the state nodal agency for EV charging across Karnataka.
What is the EV charging tariff in Belagavi?+
₹4.50 per unit under KERC's Combined Tariff Order 2025 dated 27 March 2025, schedule LT-6(c), with the rate held flat through FY2027-28. On top of that you pay a fixed charge of ₹70 per kW per month of sanctioned load on LT, or ₹200 per kVA per month of billing demand on HT. The energy rate is low, but the fixed charge is real and it is billed whether or not anyone charges.
Are demand charges waived for EV charging stations in Karnataka?+
No, and this is the most commonly misreported fact about Karnataka charging. KERC explicitly refused the distribution companies' request to move to a single-part tariff, reasoning that its existing two-part tariff already recovers only 51% of the average cost of supply and therefore gives a larger concession than the Ministry of Power's guidelines require. A 60 kW DC charger carries roughly ₹4,200 a month in fixed charges before selling a single unit. Maharashtra, on the other side of the border, does waive them entirely.
What subsidy is available for a charging station in Belagavi?+
The Karnataka Clean Mobility Policy 2025-30 offers a capital subsidy of 25%, capped at ₹10 lakh per station, for fast charging stations covering 500 stations statewide at the same rate in all zones. Slow charging stations get nothing. There is no viability gap funding in this policy. As of August 2026 no operational guidelines or application window for the charging subsidy could be verified, so treat it as gazetted but not yet demonstrably claimable.
Is EV road tax still exempt in Karnataka?+
No. The Karnataka Motor Vehicles Taxation (Amendment) Act 2026 was notified on 10 April 2026 and replaced the exemption with lifetime tax of 5% of cost up to ₹10 lakh, 8% from ₹10 to ₹25 lakh, and 10% above ₹25 lakh, for electric cars and motor cabs. Previously everything under ₹25 lakh was exempt. Electric two- and three-wheelers appear to remain exempt. Be aware that the Clean Mobility Policy document itself still carries the old exemption wording, which many sites reproduce.
Are there existing EV charging stations in Belagavi?+
Yes, but fewer than the city's adoption rate would suggest. Named sites include a ChargeZone × TATA.ev MegaCharger at Nehru Nagar, Tata Power points at Gogte Plaza and at Kakti, and Ather Grid coverage aimed at two-wheelers. For a city registering more than 600 EVs a month, that network is thin and concentrated in a few pockets, with most of the NH-48 approaches and the industrial belt poorly served.
How much does it cost to set up a charging station in Belagavi?+
Roughly ₹5–12 lakh for a small AC station and ₹12–30 lakh for a DC fast-charging site before subsidy. In Belagavi, budget particularly carefully for the HESCOM fixed charge, which is ₹70 per kW per month on LT and applies regardless of usage — on a 60 kW site that is around ₹50,000 a year of unavoidable cost. Model the whole thing with our EV charging station ROI calculator before committing.
Which DISCOM serves Belagavi for an EV charging connection?+
HESCOM, the Hubli Electricity Supply Company, which covers Belagavi, Dharwad, Gadag, Vijayapura, Bagalkot, Uttara Kannada and Haveri districts, with corporate headquarters in Hubballi. Your connection application goes to HESCOM, but BESCOM holds the State Nodal Agency designation for EV charging statewide and runs the Land Aggregator Portal that matches landowners with charge point operators.
Is Belagavi a good location for an EV charging business?+
The adoption data is the best on this corridor — around 18% of new vehicle registrations are electric — and the existing network, concentrated around Nehru Nagar, Gogte Plaza and Kakti, is thin relative to that. The counterweight is that almost all local EVs are two-wheelers, whose owners mostly charge at home, so DC fast-charging revenue will come from NH-48 through-traffic rather than residents. A realistic Belagavi plan pairs a highway DC site with AC points serving the two-wheeler base.
Do I need a licence to open a charging station in Belagavi?+
No. Public EV charging has been de-licensed across India, including Karnataka. You need a commercial HESCOM connection under the EV charging tariff category, government-approved chargers and standard safety and fire clearances for larger installations, but no electricity licence — you are selling a charging service, not reselling power.
Charging station setup in other cities
Sources checked — August 2026
- Karnataka Clean Mobility Policy 2025-30, GO No. CI 117 SPI 2024(e) · 11 February 2025
- KERC Combined Tariff Order 2025 (all ESCOMs), schedule LT-6(c) · 27 March 2025
- Karnataka Motor Vehicles Taxation (Amendment) Act 2026, notified · 10 April 2026
- Belagavi RTO / Vahan registration data, via All About Belgaum · 1 July 2026
- NHAI Toll Information System — Hirebagewadi and Kognoli plazas
- AAI passenger traffic data, FY2024-25
Indicative information only, checked August 2026. Tariff orders, subsidy windows and DISCOM processes change — verify with the Karnataka nodal agency and HESCOM before committing capital.